Description of Services provided

Topographical Survey, traffic Survey, alignment fixation, Layout Option, Geometric & Structure Design, Feasibility Report, Economical & Environment analysis has been carried out for 3078 meter of flyover and with the help of above study and data collection DPR has been prepared for the same.

MaRS Group awarded as Digital Twin Project of the Year at Big 5 Global Awards in Dubai


Read More

This will close in 200 seconds