Description of Services provided

Preparation of the Feasibility Report, Soil Investigation, formulation of Construction Methodology based on the type of soil, Preparation & Proposal of a Traffic Diversion Lab, QA-QC Plan, Preparation of DPR along with submission of reports & drawing along with copy of level book, soil test report and submission of lay out plan & pipe network design for rising mains & distribution networks & fixing up of Bench mark stations

MaRS Group awarded as Digital Twin Project of the Year at Big 5 Global Awards in Dubai


Read More

This will close in 200 seconds